View our latest 3d render of our Hydraulic deployed telescopic gangway

For more information on our gangways available from Tyne Gangway.

Tyne Gangway have secured an order to design and build an emergency escape slide simulator for use at Chicago airport. The slide will be used for fire evacuation training at the airport and will simulate the function of the inflatable slides normally used, eliminating the additional set up time and expense after each use. The slide is mounted on a custom lightweight portable trailer and can be raised/lowered by means of a screw jack driven by hand or a standard power tool with a compatible square drive. The system is modular so it can be delivered in a standard high top container. This bespoke product will be designed, manufactured and tested in less than 8 weeks for shipment to USA.

The variable and constantly moving gap between a marine vessel and the jetty or dock is an interesting problem.

Normally, the ship is at port to load or unload cargo, passengers or liquids. It is therefore reasonable to assume that the height of the deck above water or jetty is a variable because of the changing cargo weight. Then, factor in tide variances. These are predictable and tabulated, so easy to establish. But, then there is wind. A chaos factor that is difficult to predict. Specifically, when designing a tower that has a design life of at least 25 years. So, wind speed and direction are taken from historical records. This leaves us with a high-high (highest tide with largest unladen ship) and low-low (lowest tide and smallest laden ship). This can be as little as 2m and as much as 25m.

Then we need to factor in the biggest variable of all – humans.

The void between ship and dock is between 2m and 25m above a strip of water bounded by a concrete jetty and a steel hull. Arguably, a fall from 2m is survivable, but what about 50m?

What are the expectations for the captain of the visiting ship? Clear guidance to the jetty, easy and secure mooring with safe access to land for both crew and visiting officials.

While the captain does not own the jetty, there are still many instances where the jetty owners/operators believe that personnel transfer is not their problem and that the ship needs to make safe provision. The responsibility for safe access is always with the permanent feature (dock).

A question of safety

What should be considered next by the owners/operators of the jetty is how safe can the crossing be made? Unfortunately, this is often translated to ‘how cheaply can I make this problem go away?’

The correct answer to the first question is a solution that mitigates all imaginable risk to life, considering the hazardous nature of the task. The usual answer is a glorified gangplank, moved into position by a team of workers who also risk injury while manhandling the structure into place.

Does it depend what part of the world you are in? No

Does it depend on a history of previous accidents? No

Is it just a question of money? Surprisingly, no.

It is an attitude. A temporary approach to the infrastructure. A need to make profits at almost any expense. A lack of understanding of what the operators experience. Decisions made by people far removed from that watery void between ship and jetty.

The basic and common components may seem obvious, but in many cases are missing because most equipment around the world is home-made and is either inadequate or unsafe. Given the extreme angles that may be present for the gangway to span, the walkway is specially fabricated using curved or angled tread systems. These allow a non-slip walking surface through a large working angle. The marine tread allows operators to use the walkway as a staircase, even when it is horizontal.

The point at which the marine access system contacts the ship is vital and it is important to have as much information about this in advance of designing the solution. Ship handrails and available deck space all serve to complicate the arrangement.

The type and complexity of the marine access system will vary according to a wide number of factors including:

  • Type of ship
  • Range of height and reach
  • Tidal range
  • Drift
  • Frequency of use
  • Available budget

Marine access gangways can be simple bridges, moved into place manually by one operator. Simple, fixed length structures with hand and knee rail protection afforded by ropes and with a hook to secure the gangway onto the ship deck.

A variation on this is that it can be raised and lowered by a winch and cable, either manually or electrically. A further option is to use a crane, which can be used if the unit telescopes. If the gangway is a fixed length it can be powered by hydraulic cylinders and controlled from the jetty by a simple controller. The telescoping section can also be hydraulically controlled using motors. When it comes to marine super-tankers, the structure changes significantly. The gangway is likely to be fitted to a tower structure or column so that operators can climb a staircase to reach the optimal bridging level.

If the working range is too great and available jetty space is too small to allow a safe angle of access, the whole gangway can be mounted to the face of a tower. It can then travel vertically to ensure a safe working angle is maintained between ship and tower. The operators then have a choice of which level they can access the gangway to the ship. It is also possible to rotate and park parallel to the ship, thus avoiding potential clashes while the ship is maneuvering.

On smaller jetties, vertical parking of the gangways is also possible.

The tower and column designs allow peripheral features to be installed such as fire-fighting systems, CCTV, crow’s nest, meteorological equipment and cranes.

Each system is fully assembled at the factory and cycle tested for customer approval before being broken down and shipped to site anywhere in the world.

A practical approach

Finally, there is a need to consider the practicalities of these systems. They need to work in a hostile environment, often close to the high velocity transfer of volatile liquids. The marine gangway must work alongside large piping structures that move and are controlled by operators and computers, mostly working in isolation.

At the same time, consideration must be given to what happens when an emergency situation takes place. It is too late to suddenly think ‘I wish I’d bought the marine arms and marine gangways from the same company. At least I’d know for sure that they will not interfere with each other in an unpredictable situation’.

As more attention to safety at marine installations is taking place around the world it is paramount to select the right partner to assess, design and manufacture the right solution. A partner who can design, build and install marine gangways and marine arms to meet current and future needs.

This article has been reproduced from Tank Storage Magazine June/July 2018 issue.

Tyne Gangway have agreed to loan (FOC) the Port of Sunderland several gangways for the duration of the Tall Ships Regatta

The 160-metre ASRV will perform numerous tasks for the Australian Antarctic Division (AAD). “The new vessel is a multi-mission ship designed to sustain geographically dispersed stations, support helicopter operations, sustain shore parties on remote islands, map the seafloor and undertake a variety of scientific activities across the Southern Ocean.

The F.O.D.S consists of a 9.3 metre rack & pinion driven gangway complete with two fixed davits and one radial davit, the equipment is operated by hydraulic and electrical control systems. The application is to deploy specialist scientific instrumentation for environmental monitoring in one of the most hostile areas on the planet… The equipment will be installed on an Australian Government Antarctic Survey vessel under construction by the Damen shipyard group.

The installation consists of a Hydraulic Power Unit (HPU) complete with main, cleating and locking cylinders, a manifold to control a bow mounted weathertight hatch high above the waterline, once opened a gangway will then extend 9.3 metres carrying a scientific boom. The hatch and equipment will be installed with Trace Heating elements to prevent ice build-up. When fully deployed the scientific booms will rotate to their working positions to gather environmental data for analysis within the onboard research facility.

The full opening and closing sequence is automatic, controlled by the PLC interface and initiated by the control joysticks located on the control panel. The system is fitted with mechanical locks for both ‘open’ and ‘closed’ positions, preventing unnecessary incidents.
When the hatch is open and secure, the operator will then be able to deploy the gangway using the control joystick and the Rack & Pinion hydraulic drive.

The hydraulic system is driven by twin Totally Enclosed Fan Cooled (TEFC) electric motors driving pressure compensated axial piston pumps. The drive system gives 100% redundancy as the complete sequence can be completed with one pump. The IP65 solenoid valve is fitted with manual overrides for emergency operation and illuminated caps, giving the operators and ships engineer’s immediate verification of the energised valves controlling operations. All of the automated sequences is controlled by a Siemens PLC the complete electrical system having been supplied by Middlesbrough based MJR Controls. An additional feature is a pendant controller which allows the PLC to be overridden in an event of a proximity switch failure, the pendant is to be used with caution by engineering staff to enable the gangway to be recovered and the hatch closed against the Antarctic’s driving katabatic winds and extreme cold. A secondary emergency hand pump can operate all functions should a total power failure occur.

 

The sound insulated pumps and optimised power control on all functions plus the use of bio-degradable hydraulic oil (nontoxic to marine life) increases the systems green credentials. The carefully controlled trace heating ensures that the system will function in the harshest conditions both hot and cold as the vessels home base in Australia. This is a first for Tyne Gangway as it is an in-house designed complete control system supported by our partners on the project MJR.

This is a great demonstration of Tyne Gangway’s intent to develop fully powered solutions to complex personnel handling systems internal resources. This then offers the customer a one-stop package, for the complete design and build package adopting full responsibility for the turnkey installation and commissioning.

Tyne Gangway have recently designed and built 3 off 31m Dolphin Access Gangways in record time. “Enquiry to delivery in 5 weeks”

Some of the Tyne Gangway team are pictured on the last gangway exiting the production facility.