Tyne Gangway completes manufacture of a 50 metre Aluminium Bridge in record time. The DNV approved structure was designed and built in less than 7 weeks and will be used to span a steel jacket of the coast of Germany. Following completion of the 3 month project the Bridge will be used as a multi purpose gangway for accessing the Clients Heavy Lift Vessels.

Here is a great pic of Cunards Queen Mary 2, with passengers disembarking. The photo captures a visit to Clydeport Greenock (Glasgow) where both Self levelling Step gangways operate, having been designed and manufactured in-house by Tyne Gangway.

Tyne Gangway wins order to design and build 30 metre multi-purpose bridge gangway. The gangway will be deployed on a jackup vessel and used to install offshore wind turbines. The Gangway will have dual use, accessing the quay whilst in port and accessing TP foundation during installation of the Turbines. The gangway will be manufactured in 4 sections so it can accommodate a working range of between 6 and 30 metres